![Daikin FTK25JV1NB9 Service Manual Download Page 139](http://html1.mh-extra.com/html/daikin/ftk25jv1nb9/ftk25jv1nb9_service-manual_2459333139.webp)
For RK25J, RK35J, RX25J, RX35J
Si04-115
130
Removal Procedure
2.6
Removal of Partition Plate and Reactor
Procedure
Warning Be sure to turn off all power supplies at least 10 min. before
disassembling work.
Step
Procedure
Points
1. To remove the partition plate.
1
Disengage the lead
wires from the wire clip.
2
Remove the two screws
fixing the partition plate.
3
Pull the partition plate
upward to remove.