![Daikin FTK25JV1NB9 Service Manual Download Page 129](http://html1.mh-extra.com/html/daikin/ftk25jv1nb9/ftk25jv1nb9_service-manual_2459333129.webp)
For RK25J, RK35J, RX25J, RX35J
Si04-115
120
Removal Procedure
2.3
Removal of PC Board and Switch Box
Procedure
Warning Be sure to turn off all power supplies at least 10 min. before
disassembling work.
Step
Procedure
Points
1. Remove the shelter.
"
The shelter has five hooks.
"
Be sure to avoid forgetting to
restore the shelter and to
avoid loosing or damaging it.
1
Undo the five hooks
and remove the shelter.
2. Remove the printed circuit
board.
1
Disconnect the ground
wire.