![background image](http://html1.mh-extra.com/html/daikin/emura-3-series/emura-3-series_service-manual_4704526053.webp)
4
|
Components
Service manual
53
RXJ20~50A + FTXJ-A(W)(S)(B)
Split Emura 3 R32
ESIE22-04 – 2022.04
a
b
a
Cable tie
b
Switch box
7
Install the insulation on the upper side of the switch box.
a
b
a
Insulation
b
Main PCB
4.1.2 Indoor unit
To open the front panel
1
Stop operation by
.
Result:
The front panel closes automatically.
2
Open the front panel using the wireless remote control.
Result:
The front panel opens.
3
Turn the power supply OFF.
4
Pull down both locks on the back of the front panel.
5
Open the front panel until the support fits into the fixing tab.
draft – 22/04/2022 08:50