4 Installation
Installation manual
14
D2CND024A1/4AA + D2TND012~024A4AA
Wall-mounted condensing boiler
3P469346-3E – 2017.07
8
1
X2M
Wiring of the options that are to be connected to the X2M connector
must pop out from the inside of the unit via cable glands. Cable
glands that are sent with the unit must be assembled to the bottom
sheet of the boiler in case connection of these options. Below, you
can see the cable glands placement.
PG 9
PG 9 PG 7 PG 7
Holes on the bottom sheet that are reserved for cable glands are
covered with insulation material. The insulation material must be
bored if glands are to be used.
Note:
Unit must be opened to mount cable glands. See
"4.1 To open
the unit" on page 8
to reach the inside of the boiler.
Summary of Contents for D2TND012A4AA
Page 27: ......