FOR THE FOLLOWING ITEMS, TAKE SPECIAL CARE DURING CONSTRUCTION AND 
CHECK AFTER INSTALLATION IS FINISHED.

a. Items to be checked after completion of work

3. SELECTING INSTALLATION SITE

〈〈

〈〈

〈〈

〈〈

When moving the unit while removing it from the carton box, be sure to lift it by holding on to the 

four lifting lugs without exerting any pressure on other parts, especially, the refrigerant piping.
When it may exceed 30

°°°°

C and RH80% in the ceiling or fresh air is inducted into the ceiling, an addi-

tional insulation (Thickness 10mm or more of glasswool or polyethylene form) is required.

〉〉

〉〉

〉〉

〉〉

(1) Select an installation site where the following conditions are fulfilled and that meets your customer’s approval.

Where is resistible against weight of BEV unit.

Where the false ceiling is not noticeably on an incline.

Where there is no risk of flammable gas leakage.

Where sufficient clearance for maintenance and service can be ensured.

Where the total piping length involving indoor unit and outdoor unit is below the allowable piping length.
(See the installation mamual included with the outdoor unit for “6. REFRIGERANT PIPING WORK.”)

Locations where a maintenance hole can be installed. 

(Refer to Fig. 1)

(2) After considering whether the location the unit is to be installed can support its weight, if it seems 

dangerous, install it after reinforcing the location with boards, crossbeams, etc.

(3) Install the gas piping connection piping (7) no further than 250mm form the hole for the thermistor 

on the unit. (Refer to the “8-1 HOW TO CONNECT WIRINGS”)

(4) Avoid any contact with the ceiling surface, as this may cause noise and vibration.

[CAUTIONS]

Install the indoor and outdoor units, power supply wiring and connecting wiring at least 1 meter away from 
televisions or radios in order to prevent image interference or noise.
(Depending on the radio waves, a distance of 1 meter may not be sufficient enough to eliminate the noise.)

Items to be checked

If not properly done, what is likely to occur

Check

Are the indoor and outdoor and BEV unit fixed firmly?

The units may drop, vibrate or make noise.

Is the gas leak test finished? 

It may result in insuffcient cooling.

Is the unit fully insulated?

Condensate may drip.

Does the power supply voltage correspond to that 
shown on the name plate?

The unit may malfunction or the components burn out.

Are wiring and piping correct?

The unit may malfunction or the components burn out.

Is the unit safely grounded?

Risk of electric shock at electric leakage.

Is wiring size according to specifications?

The unit may malfunction or the components burn out.

Are refrigerant piping length and additional refrigerant 
charge noted down?

The refrigerant charge in the system is not clear.

3P084604-2A_Eng.fm  Page 4  Wednesday, March 3, 2004  10:01 AM

Summary of Contents for BEVQ100MVE

Page 1: ...A MANO PARA LEER EN CASO DE TENER ALGUNA DUDA PRIMA DELL INSTALLAZIONE LEGGERE ATTENTAMENTE QUESTE ISTRUZIONI TENERE QUESTO MANUALE A PORTATA DI MANO PER RIFERIMENTI FUTURI LEES DEZE INSTRUCTIES ZORGV...

Page 2: ...conformidade com a s seguinte s norma s ou outro s documento s normativo s desde que estes sejam utilizados de acordo com as nossas instru es overholder f lgende standard er eller andet andre retning...

Page 3: ...aler or qualified personnel to carry out installation work Do not try to install the machine yourself Improper installation may result in water leakage electric shocks or fire Perform installation wor...

Page 4: ...m televisions or radios in order to prevent image interference or noise Depending on the radio waves a distance of 1 meter may not be sufficient enough to eliminate the noise Remote controller wireles...

Page 5: ...e exposed to combustible gas and where volatile flammable gas like thinner or gasoline is used Gas in the vicinity of the unit could ignite Where machines can generate electromagnetic waves Control sy...

Page 6: ...eight if it seems dangerous install it after reinforcing the location with boards crossbeams etc 3 Install the gas piping connection piping 7 no further than 250mm form the hole for the thermistor on...

Page 7: ...stall so that the control box lid is facing down Take the gas piping thermistor out from above Horizontal position Direction of the gas piping connection piping 100 Upper Lower 100 250 or more 500 or...

Page 8: ...stall the hanging bolts Use M8 hanging bolts If it is pre set use hole in anchors Otherwise use embedded inserts or embedded foundation bolts to make sure that the weight of the unit can be supported...

Page 9: ...h tape Do not allow anything other than the designated refrigerant to get mixed into the refrigerant circuit such as air etc If any refrigerant gas leaks while working on the unit ventilate the room t...

Page 10: ...ecting section after checking gas leakage by thoroughly studying the following figure Wrap the insulation for fitting 3 4 around the insulation for the joints on the liquid piping side and the gas pip...

Page 11: ...carried out nitrogen substitution or while inserting nitrogen into the refrigerant piping Once this is done connect the indoor unit with a flared connection Nitrogen should be set to 0 02 MPa 0 2 kg...

Page 12: ...Additional filling amount a b c d e f g h i j k l m n p q Refer also to the installation manual included with the outdoor unit 7 ELECTRIC WIRING WORK 7 1 GENERAL INSTRUCTIONS All field supplied parts...

Page 13: ...x Fuse Amps A KW Fan Motor Rated Output kW FLA Full Load Amps A NOTES The above Table of Electrical Characteristics refers to the BEV unit only See the technical documents for other details 7 3 SPECIF...

Page 14: ...e and the transmission wiring using the included clamp 1 CAUTIONS Do not under any circumstances connect the power supply wiring to the transmission terminal block F1 F2 as this may cause damage to th...

Page 15: ...the unit keep the weak wiring gas piping thermistor lead wire transmission wiring at least 50 mm away from strong wiring power supply wiring inter unit wiring ground wire and other power wiring The e...

Page 16: ...P1 P2 L N 1 2 3 F1 F2 L N P1 P2 P1 P2 L N T1 T2 P1 P2 F1 F2 L N P1 P2 IN D OUT D F1 F2 F1 F2 Control box Outdoor unit BEV Unit A Indoor Unit A Indoor Unit B Indoor Unit C Normal VRV Indoor Unit BEV Un...

Page 17: ...1 P2 P1 P2 L N OUT D BS IN D F1 F2 F1 F2 L N IN D OUT D F1 F2 F1 F2 Control box Outdoor unit Indoor Unit A F1 F2 F1 F2 1 2 TO indoor 3 F1 F2 L N BEV Unit A BS Unit A BS Unit B P1 P2 P1 P2 Indoor Unit...

Page 18: ...Once all piping work is done screw the control box lid shut using the mounting screws 9 HOW TO ATTACH THE NAMEPLATE Attach the included nameplate 9 next to the machine nameplate on the indoor unit 10...

Page 19: ...0404 HT 3P084604 2A EM03A115 FS 3P084604 2_cv fm Page 2 Thursday February 5 2004 2 41 PM...

Reviews: