![background image](http://html1.mh-extra.com/html/daikin/bevq100mve/bevq100mve_installation-manual_2460441016.webp)
14
English
8-3 WIRING EXAMPLE
•
Fit the power supply wiring of each unit with a switch and fuse as shown in the drawing.
COMPLETE SYSTEM EXAMPLE (3 systems)
1. When using 1 remote controller for 1 indoor unit. (Normal operation)
<Caution>
Group control is not possible between ceiling suspended cassette type units and normal VRV indoor units.
Power supply wiring
Transmission wiring
Switch
Fuse
Power supply
Main switch
Remote controller
BEV unit
Indoor unit
BS unit
(Only for Heat
recovery
system)
Fig. 17
L N
1 2
TO indoor
TO indoor
TO indoor
3 F
1
F
2
L N
1 2 3
P
1
P
2
P
1
P
2
L N
1 2 3 F
1
F
2
L N
P
1
P
2
P
1
P
2
L N
1 2 3 F
1
F
2
L N
P
1
P
2
P
1
P
2
L N
T
1
T
2
P
1
P
2
F
1
F
2
L N
P
1
P
2
IN/D OUT/D
F1 F2 F1 F2
Control box
Outdoor unit
BEV Unit A
Indoor Unit A
Indoor Unit B
Indoor Unit C
Normal VRV
Indoor Unit
BEV Unit B
BEV Unit C
Maximum one indoor unit
for each BEV unit.
Remote controller
Remote controller
Remote controller
Remote controller
When calculating the limit of connected
indoor units, count all the lower BEV units
as one unit.
If the remote controller does not have a cooling/heating
selection right, “operation switch is being managed” will
be displayed.
Fig. 18
1 2 3
1 2 3
Power supply
220-240V
50Hz
or
220V
60Hz
Power supply
220-240V
50Hz
or
220V
60Hz
Power supply
220-240V
50Hz
or
220V
60Hz
Power supply
220-240V
50Hz
or
220V
60Hz
3P084604-2A_Eng.fm Page 14 Wednesday, March 3, 2004 10:01 AM