![background image](http://html.mh-extra.com/html/daikin/altherma-3-r-ech2o/altherma-3-r-ech2o_installers-reference-manual_501188230.webp)
11
|
Configuration
Installer reference guide
230
ERLA11~W1 + EBSH/X(B)11+16P30+50DF
Daikin Altherma 3 R ECH₂O
4P663482-1A – 2021.11
BBR16 activation
#
Code
Description
[9.9.F]
[7-07]
BBR16 activation
:
▪
0:
disabled
▪
1:
enabled
BBR16 power limit
#
Code
Description
[9.9.G]
[N/A]
BBR16 power limit
: This setting can only
be modified via the menu structure.
▪
0 kW~25 kW, step 0.1 kW
Energy metering
Energy metering
If energy metering is performed by the use of external power meters, configure the
settings as described below. Select the pulse frequency output of each power
meter in accordance with the power meter specifications. It is possible to connect
up to 2 power meters with different pulse frequencies. If only 1 or no power meter
is used, select '
None
' to indicate the corresponding pulse input is NOT used.
#
Code
Description
[9.A.1]
[D‑08]
Electricity meter 1
:
▪
0
None
: NOT installed
▪
1
1/10kWh
: Installed
▪
2
1/kWh
: Installed
▪
3
10/kWh
: Installed
▪
4
100/kWh
: Installed
▪
5
1000/kWh
: Installed
[9.A.2]
[D‑09]
Electricity meter 2
:
▪
0
None
: NOT installed
▪
1
1/10kWh
: Installed
▪
2
1/kWh
: Installed
▪
3
10/kWh
: Installed
▪
4
100/kWh
: Installed
▪
5
1000/kWh
: Installed
Summary of Contents for Altherma 3 R ECH2O
Page 313: ......
Page 314: ......
Page 315: ......
Page 316: ...4P663482 1A 2021 11 Copyright 2021 Daikin Verantwortung für Energie und Umwelt ...