![background image](http://html.mh-extra.com/html/daikin/altherma-3-h-mt-ech2o/altherma-3-h-mt-ech2o_installers-reference-manual_501180140.webp)
9
|
Electrical installation
Installer reference guide
140
EPRA08~W1 + ETSH/X(B)12P30+50EF
Daikin Altherma 3 H MT ECH₂O
4P663478-1 – 2021.07
1
User interface panel
1
3
4
2
2
Switch box
3
Switch box cover
4
Top cover
2
Connect the DHW signal cable as shown in the illustration below.
A
B
A
B
X 2M
1
1112
DHW output
Max. load
0,3 A - 230 V AC
12
11
3
Fix the cable with cable ties to the cable tie mountings. General information,
see
Summary of Contents for Altherma 3 H MT ECH2O
Page 301: ......
Page 302: ......
Page 303: ......
Page 304: ...4P663478 1 2021 07 Copyright 2021 Daikin Verantwortung für Energie und Umwelt ...