![background image](http://html.mh-extra.com/html/daikin/altherma-3-h-mt-ech2o/altherma-3-h-mt-ech2o_installers-reference-manual_501180197.webp)
10
|
Configuration
Installer reference guide
197
EPRA08~W1 + ETSH/X(B)12P30+50EF
Daikin Altherma 3 H MT ECH₂O
4P663478-1 – 2021.07
Electricity prices and gas price
Only applicable in combination with the bivalent function. See also
218].
#
Code
Description
[7.5.1]
N/A
Electricity price
>
High
[7.5.2]
N/A
Electricity price
>
Medium
[7.5.3]
N/A
Electricity price
>
Low
[7.6]
N/A
Gas price
INFORMATION
Electricity price can only be set when bivalent is ON ([9.C.1] or [C-02]). These values
can only be set in menu structure [7.5.1], [7.5.2] and [7.5.3]. Do NOT use overview
settings.
To set the gas price
1
Go to [7.6]:
User settings
>
Gas price
.
2
Select the correct gas price.
3
Confirm the changes.
INFORMATION
Price value ranging from 0.00~990 valuta/kWh (with 2 significant values).
To set the electricity price
1
Go to [7.5.1]/[7.5.2]/[7.5.3]:
User settings
>
Electricity
price
>
High
/
Medium
/
Low
.
2
Select the correct electricity price.
3
Confirm the changes.
4
Repeat this for all three electricity prices.
—
INFORMATION
Price value ranging from 0.00~990 valuta/kWh (with 2 significant values).
INFORMATION
If no schedule is set, the
Electricity price
for
High
is taken into account.
To set the electricity price schedule timer
1
Go to [7.5.4]:
User settings
>
Electricity price
>
Schedule
.
2
Program the selection using the scheduling screen. You can set
the
High
,
Medium
and
Low
electricity prices according to your
electricity supplier.
—
3
Confirm the changes.
Summary of Contents for Altherma 3 H MT ECH2O
Page 301: ......
Page 302: ......
Page 303: ......
Page 304: ...4P663478 1 2021 07 Copyright 2021 Daikin Verantwortung für Energie und Umwelt ...