8.2.5 To fill the heating system
DANGER: RISK OF ELECTROCUTION
During the filling process, water can escape from any leaking point and can cause an
electrical shock if it comes into contact with live parts.
▪
Before the filling process, de-energise the unit.
▪
After the first filling and before switching on the unit with the mains switch, check
whether all electric parts and connection points are dry.
1
Connect a hose with a non-return valve (1/2") and an external manometer
(field supply) to a water tap and the fill and drain valve. Secure the hose
against slipping off.
j/k
e.1
B
AB
A
e.2
50%
(45%)
100%
0%
CH
Bypass
(B)
(A)
f
a
h
i
c j
k
d
b
g
50% (67%)
100%
0%
CH
DHW
(A)
(B)
a
Hose with a non-return valve (1/2") and an external manometer (field supply)
b
Fill and drain valve