8
|
Electrical installation
Installer reference guide
103
EPRA14~W1 + ET9W
Daikin Altherma 3 H HT F
4P587503-1A – 2020.01
A
1
2
4
5
S6S
S7S
S8S
S9S
3
B
A
B
A8P
X801M
1
2
3
4
5
a
a
Installation of EKRP1AHTA is required.
3
Fix the cable with cable ties to the cable tie mountings.
8.3.10 To connect the safety thermostat (normally closed contact)
1
Open the following (see
"6.2.5 To open the indoor unit"
1
Top panel
1
2
3
2
User interface panel
3
Upper switch box cover
Main zone
Wires: 2×0.75 mm²
—
2
Connect the safety thermostat (normally closed) cable to the appropriate
terminals as shown in the illustration below.
Summary of Contents for Altherma 3 H HT EPRA18DAW1
Page 250: ......
Page 251: ......
Page 252: ...4P587503 1A 2020 01 Copyright 2019 Daikin Verantwortung f r Energie und Umwelt...