![background image](http://html.mh-extra.com/html/daikin/2mkd58bvm/2mkd58bvm_service-manual_501072251.webp)
Outdoor Unit (80 / 90 Class)
Si12-411A
240
Removal Procedure
1.10 Removal of
Compressor
Procedure
Warning
Be sure to wait 10 minutes or more after turning off all power supplies
before disassembling work.
Step
Procedure
Points
1
Remove the terminal
cover.
Be careful to avoid burning
the compressor terminals or
the nameplate.
2
Remove the overload
relay.
3
Disconnect the flag
shape terminal.
As precaution, keep the
contents in memorandum.
4
There is one nut fixing
the compressor.
Remove the nut with a
spanner.
Summary of Contents for 2MKD58BVM
Page 1: ...C Series Applied Models zInverter Multi Cooling Only zInverter Multi Heat Pump Si12 411A ...
Page 6: ...Si12 411A Table of Contents v Index i Drawings Flow Charts v ...
Page 7: ...Si12 411A vi Table of Contents ...
Page 67: ...Specifications Si12 411A 56 Specifications ...
Page 173: ...Instruction Si12 411A 162 System Configuration ...
Page 227: ...Check Si12 411A 216 Service Diagnosis ...
Page 295: ...Si12 411A iv Index ...
Page 298: ...Si12 411A Printed in Singapore 03 2005 AK COS ...