![background image](http://html.mh-extra.com/html/daikin/2mkd58bvm/2mkd58bvm_service-manual_501072234.webp)
Si12-411A
Outdoor Unit (80 / 90 Class)
Removal Procedure
223
3
Remove the earth wire.
4
Remove 1 screw of the
terminal board.
5
Release the tab on the
top right of the terminal
board.
6
Pull out the terminal
board and open it.
Glass tube fuse and varistor
cannot be replaced
individually because lead-
free soldering is provided.
Step
Procedure
Points
Summary of Contents for 2MKD58BVM
Page 1: ...C Series Applied Models zInverter Multi Cooling Only zInverter Multi Heat Pump Si12 411A ...
Page 6: ...Si12 411A Table of Contents v Index i Drawings Flow Charts v ...
Page 7: ...Si12 411A vi Table of Contents ...
Page 67: ...Specifications Si12 411A 56 Specifications ...
Page 173: ...Instruction Si12 411A 162 System Configuration ...
Page 227: ...Check Si12 411A 216 Service Diagnosis ...
Page 295: ...Si12 411A iv Index ...
Page 298: ...Si12 411A Printed in Singapore 03 2005 AK COS ...