![background image](http://html.mh-extra.com/html/daikin/2mkd58bvm/2mkd58bvm_service-manual_501072263.webp)
Outdoor Unit (50 / 52 / 58 / 68 / 75 Class)
Si12-411A
252
Removal Procedure
2.6
Removal of
Four Way Valve Coil
,
Solenoid Valve Coil
,
Electronic Expansion Valve Coil
and
Thermistor
Procedure
Warning
Be sure to wait 10 minutes or more after turning off all power supplies
before disassembling work.
Step
Procedure
Points
1
Remove 1 screw of the
four way valve coil.
2
Remove one screw of
the solenoid valve coil.
3
Remove the electronic
expansion valve coil for
each room.
Place the thermistor so that
its end comes up to the end
of the presser spring.
4
Release the thermistor
presser spring, and
remove the discharge
pipe thermistor.
Be careful not to lose the
presser spring for the
discharge pipe thermistor.
Summary of Contents for 2MKD58BVM
Page 1: ...C Series Applied Models zInverter Multi Cooling Only zInverter Multi Heat Pump Si12 411A ...
Page 6: ...Si12 411A Table of Contents v Index i Drawings Flow Charts v ...
Page 7: ...Si12 411A vi Table of Contents ...
Page 67: ...Specifications Si12 411A 56 Specifications ...
Page 173: ...Instruction Si12 411A 162 System Configuration ...
Page 227: ...Check Si12 411A 216 Service Diagnosis ...
Page 295: ...Si12 411A iv Index ...
Page 298: ...Si12 411A Printed in Singapore 03 2005 AK COS ...