I
NSULATION
R
ESISTANCE
M
EASUREMENT
AND
W
ITHSTAND
V
OLTAGE
T
EST
M
AINTENANCE
AND
I
NSPECTION
C
HAPTER
8
8-6
– Short-circuit the positive (+) and the negative ( - ) sides of the output terminal.
– Unground all the case grounding cables (line No.80) and insulate them with insulation tape.
– For DR1, 2 and 4, short-circuit the AC side and positive (+) output side and the AC side and negative
( - ) output side respectively.
– Short-circuit between TR1(C1)-(E1), TR2(C2)-(E2), TR4(C2)-(E2), TR5(C1)-(E1), TR5(C2)-(E2),
TR6(C1)-(E1).
– Apply NF.
– After finishing insulation resistance measurement, return the above to the original state.
• After finishing insulation resistance measurement, it is necessary to remove the
shortcircuit cables and return the welding power source to the original state.
If the power is turned on without returning it to the original state, the welding power
source will burn out.
Summary of Contents for OTC WB-P400
Page 2: ......
Page 8: ...TABLE OF CONTENTS vi MEMO...
Page 52: ...WIRING OF VOLTAGE DETECTION CABLE AT BASE METAL SIDE CONNECTION CHAPTER 4 4 18...
Page 112: ...OPERATION OF ANALOG REMOTE CONTROL OPTIONAL WELDING CONDITION CHAPTER 6 6 50...
Page 130: ...CHECKING SOFTWARE VERSION ADMINISTRATOR FUNCTIONS CHAPTER 7 7 18...
Page 142: ...TROUBLESHOOTING TROUBLESHOOTING CHAPTER 9 9 6...
Page 158: ...MATERIALS FOR SETTING WELDING CONDITIONS REFERENCE MATERIALS CHAPTER 10 10 16...