27
■
Active:
Click this to toggle if the scheduled event is active or
disabled.
■
Weekly:
Select the days of the week that the event should be
executed on, when active.
■
Time:
Set the time that the event should begin execution on all
selected days, when active.
■
Macro/Extension Macro:
Use the dropdown to select the Macro
or Extension Macro to execute.
2) Schedule Once:
Items in this section are scheduled to occur a single
time at the specified time and date. Each item will automatically
change to “None Active” after they have been executed once. Click on
“Save Change” to save the changes to the scheduled event.
Summary of Contents for CR-KP1
Page 1: ...OPERATION MANUAL CR KP1 CR KP2 15 or 9 Button Wall Mount Keypad Control Systems...
Page 2: ......
Page 45: ......
Page 46: ......
Page 47: ......