4.2.2. Connecting the system to the water line.
Connecting the system to the mains water must be performed with the corresponding By-pass (figure
2), either by using the original by-pass or with 3 ball valves installed in the pipeline.
Below is the diagram of the positions of the original by-pass ball valves which come with the system.
Figure 2.
Diagram of the original by-pass positions.
BY-PASS POSITION
OUTLET
INTLET
IN SERVICE POSITION
OUTLET
INLET
With the valves in
By-pass
position, the
water supply
won’t
enter the softener.
Untreated water will be supplied to the
system.
With the valves in the
in service
position, the
water supply will enter the softener.
Water will be supplied to the system through
the softener.
The inlet and outlet of the bypass are indicated by the corresponding arrows.
WARNING:
The water supply should be adequate to the flow of water to be treated,
with a pressure between 2.5 and 4Kg/cm². If the pressure is less than 2.5Kg/cm² a
pump system must be installed to ensure the required flow and pressure. If the
pressure is greater than 6Kg/cm² a pressure reducer must be installed.
Summary of Contents for D-DF Series
Page 1: ...Water conditioning System SOFTENER D DF D UF Series INSTRUCTION MANUAL OPERATION MAINTENANCE ...
Page 23: ...23 ref MA ED 0008 EN V16 0 MIÑO DESCALCIFICADOR D DF M3 D UF M3 pdf 9 PARTS ...
Page 24: ...24 ref MA ED 0008 EN V16 0 MIÑO DESCALCIFICADOR D DF M3 D UF M3 pdf ...
Page 25: ...25 ref MA ED 0008 EN V16 0 MIÑO DESCALCIFICADOR D DF M3 D UF M3 pdf 10 DIMENSIONS Mm Inches ...