6. - SOFTENER START-UP

 

 

Once the hydraulic circuit has been realised, connected to a power source and the microprocessor has been programmed, 
the system can be started up. Follow the steps as described below: 

 

6.1. -  How to start up the softener.

 

 

 

Bleed the air bottle

 

 

-

 

- Make sure that the softener’s inlet and outlet valves are closed and the bypass is open to assure that there is 

water in the system. 

 

-

 

Hold  the 

MANUAL  REGENRATION 

button  for  5  seconds;  after  so  a  manual  regeneration  will  begin.  The 

controller will send an order so that the piston moves to the CYCLE 1 position, 

BACKWASH.

 

 

 
 

Keep in mind that the motor takes a while to move onto the next cycle, and it is indicated that is moving with 

the  flashing  message  "GO  TO  +  NEXT  CYCLE  NAME".  Until  that  message  disappears  from  the  screen,  you 

cannot advance to the next cycle 

 
 
 
 
 
 

 

-

 

  Once the piston is allocated in the backwash position, open the inlet valve very slowly a ¼ of the way allowing 

water to enter the system. 

 

-

 

Allow all of the air to be released from the resins bottle. Once all of the air has been bled (Water starts flowing 

slowly through the drain), slowly open the supply valve fully. 

 

-

 

Let the water drain away until it turns completely clear. 

 

 

WARNING: If the valve is opened too much or too quickly resin can be lost.  In this position 
you must hear how the air escapes slowly through the drain line. 

 

 

Start up

 

 

-

 

Next, PRESS & RELEASE the 

MANUAL REGENERATION 

button to manually advance the regeneration cycles. 

Repeat this operation until you reach CYCLE 4, 

REFILL 

in order to bleed the brine line of air.  Let  the  water 

flow and bleeds all of the air bubbles from the  suction line. Once bled: 

 

-

 

Let the system fill the brine tank itself. Afterwards, advance the cycle to 

SERVICE.

 

 

 

-

 

Next,  you  must  check  that  the  system  is  sucking.  In  the 

SERVICE 

position,  press  the 

MANUAL 

REGENERATION 

button  for  5  seconds  to  start  another  regeneration  and  advance  the  cycles  to  CYCLE  2, 

BRINE

,  just as we’ve described before. Visually verify the system is sucking water from the salt tank and is 

able to remove the water from the brine tank completely. The suction must be constant and the water level in 

the tank must go down. For a further good subsequent performance, it is critical to check this. If you take air in 

the  suction  line,  cancel  the  regeneration  by  advancing  the  cycles  to  SERVICE,  review  and  tighten  the 

components of the suction line and then perform the check.  

Summary of Contents for D-DF Series

Page 1: ...Water conditioning System SOFTENER D DF D UF Series INSTRUCTION MANUAL OPERATION MAINTENANCE ...

Page 2: ... It is important to take into account that as indicated above softener systems increase the concentration of sodium in the treated water more so than that of the water that enters the system Depending on the concentration of sodium and hardness in the water which enter the system the value of sodium in the treated water can be above the values recommended in European Directive 98 83 CE If the wate...

Page 3: ...n origin performing a physical chemical and bacteriological analysis will be necessary to ensure the proper functioning of the water softener equipment please contact your dealer so they can advise you in these circumstances The water supply must be suitably filtered so installing sediment prefilter to facilitate the removal of suspended particles in order to protect internal parts of the valve af...

Page 4: ... electrical and hydraulic installations Do not install any unit between the outlet of the softener and the inlet of the water heater within less than 3m of piping If there is a heating element in the system a non return valve must be installed to prevent the hot water damaging the water softener COMPACT SOFTENER Figure 1 Compact softener installation diagram TREATED WATER UNTREATED WATER 1 By pass...

Page 5: ... IN SERVICE POSITION OUTLET INLET With the valves in By pass position the water supply won t enter the softener Untreated water will be supplied to the system With the valves in the in service position the water supply will enter the softener Water will be supplied to the system through the softener The inlet and outlet of the bypass are indicated by the corresponding arrows WARNING The water supp...

Page 6: ...t the case please consult our technical department The drain line connection will be done with a flexible hose which has an interior diameter of 15mm IMPORTANT The drain hose mustn t be connected to a ditch drain line or sewer Always leave an air gap between the drain and the general drain to prevent the possibility of return through the drain This could affect the system working properly Figure 3...

Page 7: ...piece of tubing with an interior diameter of 15mm to the attachment and hang it so it reaches the drain Connect a tube or flexible hose with an interior diameter of 15mm Figure 4 Tank s overflow attachment 4 2 6 Electrical connections Once the previous connections have been made the softener s valve programmer must be connected to the mains supply 220V 50Hz via the transformer supplied with the sy...

Page 8: ... the pointer to set the parameters TIME DAY Access to programme the time and day INCREASE VALUES AND CONFIRMATION Increases the value of the parameters to configure Confirms the programmed values MODE Access to configure regeneration mode SET REGEN Access to configure the parameters of the regeneration mode selected SET CYCLE Access to the configuration of the regeneration cycle times MANUAL REGEN...

Page 9: ...UF M3 pdf 5 1 DAY TIME CONFIGURATION Steps to follow Access to the configuration menu Move the cursor over the clock to set the hour and minute Move Increase value Move the cursor over the weekly calendar to set the day Move Confirm Save the programmed values ...

Page 10: ...ume of treated water has run out Once programmed the screen will show the following TIME OF DAY DAY OF THE VOLUMETRIC WEEK CONTROL INDICATOR AVAILABLE VOLUME STATE MODE 3 WEEK Work mode with weekly chronometrical regeneration The system will regenerate on the days of the week selected at the time established Once programmed the screen will show the following TIME OF DAY DAY OF THE WEEK TIME DAY UN...

Page 11: ... to the desired work configuration TIME Move Confirm Save the programmed values 5 2 1 1 TIMED CONFIGURATION INTERVAL BETWEEN REGENERACIONS MODE 1 TIMED To access the Work Mode press Steps to follow Access to the configuration menu Move the cursor to the desired regeneration time Move Increase value Move the cursor to set the number of days between regenerations Move Increase value Save the program...

Page 12: ...IMM Move Confirm Move the cursor and confirm the desired measurement units L Move Confirm Save the programmed values 5 2 2 1 VOLUME OF TREATED WATER CONFIGURATION MODE 2 METER IMM To access the Work Mode press Steps to follow L Access to the configuration menu Move the cursor to set the volume of water that can be treated by the softener s resin bed Move Increase value SEE THE TABLE ATTACHED TO SE...

Page 13: ... work configuration WEEK Move Increase value Save the programmed values 5 2 3 1 REGENERACION TIME DAY CONFIGURATION MODE 3 WEEK To access the programming of the regeneration time press Access to the configuration menu Move the cursor to set the regeneration time desired Move Increase value Move the cursor to set the days that we wish regenerations to happen on Move Confirm regeneration days Save t...

Page 14: ... CONFIGURATION MODE 4 METER DELAY To access the Work Mode press Steps to follow Access to the configuration menu Move the cursor to set the regeneration time desired METERDELAY Move Confirm Move the cursor and set the desired measurement Units L Move Confirm Save the programmed values ...

Page 15: ...nfiguration menu Move the cursor to set the regeneration time desired Move Increase value Move the cursor to set the maximum number of days between regenerations Move Increase value Move the cursor to set the volume that the softener s resin bed can treat Move Increase value SEE THE TABLE ATTACHED TO SET THE VOLUME OF WATER TREATED DEPENDING ON THE SOFTENER S RESIN BED Save the programmed values S...

Page 16: ...of hardness programme 3600 litres The values shown in the D DF M 3 table have been calculated for an exchange capacity established by HIDRO WATER Depending on the amount of salt used for regenerating the values shown in the table may vary CALCULATION TABLE TO PROGRAMME THE VOLUME OF TREATED WATER BY A D UF M3 SYSTEM DEPENDING ON THE RESIN AND HARDNESS OF THE WATER HARDNESS ºHF FOR D UF M3 SYSTEMS ...

Page 17: ...TIMES To access the programming of the regeneration time press Access to the regeneration cycle times configuration menu Move the cursor to set the minutes of each cycle Move Increase value SEE THE TABLE ATTACHED TO SET THE VOLUME OF WATER TREATED DEPENDING ON THE SOFTENER S RESIN BED Save the programmed values ...

Page 18: ... 65 min 5 min 20 min 40 10 min 65 min 10 min 25 min 50 10 min 65 min 10 min 15 min 60 10 min 65 min 10 min 20 min 80 10 min 65 min 10 min 15 min 100 10 min 65 min 10 min 15 min 125 10 min 65 min 10 min 20 min TIMING PROGRAMME FOR D UF M SYSTEMS LITRES OF RESIN BACKWASH BRINE DRAW RAPID RINSE REFILL 14 5 min 60 min 5 min 4 min 18 5 min 60 min 5 min 6 min 22 5 min 60 min 5 min 8 min 35 5 min 60 min ...

Page 19: ...ts flowing slowly through the drain slowly open the supply valve fully Let the water drain away until it turns completely clear WARNING If the valve is opened too much or too quickly resin can be lost In this position you must hear how the air escapes slowly through the drain line Start up Next PRESS RELEASE the MANUAL REGENERATION button to manually advance the regeneration cycles Repeat this ope...

Page 20: ...ve softened water close the bypass and open the softener s outlet valve Check that the turbine works correctly by opening a tap faucet and check that the treated water on the display decreases Softened water regulation For domestic consumption a residual hardness of 8 to 10ºF is recommended To adjust the hardness half open the built in mixing controller which is on the same valve Check the hardnes...

Page 21: ...entially as indicated above 7 2 RETURNING TO THE INITIAL SETTING DUE TO A FAILURE IN THE POWER SUPPLY When a power failure has occurred during the regeneration process upon recovering the supply the programmer performs an internal reset to retrieve the set values and return to the position where it stopped During this period the programmer shouldn t be handled the display will show 7 3 System erro...

Page 22: ...EEK weekly clockwork TIME OF DAY DAY OF THE WEEK TIME DAY UNTIL THE NEXT REGENERATION STATE 8 3 CONFIGURATION METER IMM Immediate Volumetric TIME OF DAY DAY OF VOLUMETRIC THE WEEK CONTOL AVAILABLE VOLUME STATE 8 4 CONFIGURATION METER DELAY Delayed volumetric TIME OF DAY DAY OF VOLUMETRIC THE WEEK CONTOL AVAILABLE DELAYED VOLUME REG STATE When the meter reaches zero the display will show the follow...

Page 23: ...23 ref MA ED 0008 EN V16 0 MIÑO DESCALCIFICADOR D DF M3 D UF M3 pdf 9 PARTS ...

Page 24: ...24 ref MA ED 0008 EN V16 0 MIÑO DESCALCIFICADOR D DF M3 D UF M3 pdf ...

Page 25: ...25 ref MA ED 0008 EN V16 0 MIÑO DESCALCIFICADOR D DF M3 D UF M3 pdf 10 DIMENSIONS Mm Inches ...

Page 26: ...rect time 4 Continuous regeneration a Faulty programmer a Replace the programmer 5 The control does not regenerate automatically but does regenerate when the button is pressed a If the water flow indicator does not work refer to point No 5 of the table b Faulty circuit board c Hardness and capacity are set incorrectly a b c As the same as point 2 of this manual Replace the programmer Set correct v...

Page 27: ...ly b Remove the salt regulator and wash the dirt off Manually programme the system to brine extraction to clean the salt regulator After this set the controller to Vacuum to remove the brine from the tank c Replace the faulty parts 10 Intermittent or erratic brine removal a b Water pressure too low Faulty injector a Set the pump to maintain at least 2 5 kg cm in the softener b Replace the injector...