CTC 380 IC
41
9. Operation
9.1 General information
Check after installation with the installer whether the system
is fully operational.
Let the installer explain all regulation and control elements of the heating boiler
and the operation of the comfort control so that you are familiar with the boiler
system and know how the boiler system works and needs to be maintained.
The radiators must be deaired after approx. 3 days and water must be added,
if required.
9.2 Regular checks
The regular checks should include the following points:
• Manometer check. With too low pressure, add water to the heating system
filling and emptying cocks.
• Check heating oil level in the tank.
• Check comfort control settings.
• Check boiler, pre-run and flue gat temperature.
• Check burner in accordance with the instructions.
• Check and maintain neutralisation device (neutralisation box), its functions
and ph value in accordance with the respective instructions and regulations.
• Check the function of the siphon.
In order to ensure that the system works well, in a power-saving manner and
ensures low levels of emissions, the system should (recommended once a year)
be maintained and check with regard to settings values.
9.3 Standstill
If the system should be deactivated, this is performed with the operating switch,
see Section Electric installation – comfort control.
9.4 Risk of frost
Never activate the boiler if it is suspected that the boiler or parts
pf the heating system may have frozen. This results in damage to the boiler and the
pipes in the house. Consult your heating installer.
Regards protective operation, see Section Electric installation – comfort control.
Summary of Contents for CTC 380 IC
Page 2: ......
Page 3: ...CTC 380 IC Models 17 19 24 29 162 105 11 1 2013 05 21...
Page 4: ......
Page 6: ...CTC 380 IC 6...
Page 45: ...CTC 380 IC 45...
Page 46: ......
Page 67: ...21 Boiler 8 ELECTRICAL EQUIPMENT 380IC 17 19 8 1 Wiring diagram LMO14 113...
Page 73: ......
Page 74: ......
Page 75: ......