HV DTemp Measurement System – Maintenance and Cleaning
User Guide
47
Version 01.00 // 2021
6.2 Maintenance services
Before delivery, each HV DTemp-P central unit is subjected to a functional test. In addition,
a test certificate (HV insulation test) is issued for each central unit. This is documented by
the stickers "Function tested" and "HV insulation test" which are attached to the rear side
of the module housing.
To ensure reliability and functionality, a measurement module should be checked at least
every 12 months. CSM offers maintenance packages and a repair service for this purpose.
f
Functional test
f
High-voltage insulation test (functional testing included)
f
Repair service
NOTE!
i
An insulation test every 12 months is required in order to ensure the
measurement module’s operational safety.
Make sure that a high-voltage insulation test according to
EN 61010-1:2010 is carried out at least every 12 months.
6.3 Cleaning instructions
WARNING!
An HV DTemp-P central unit is applied in high-voltage applications.
Improper use can be life-threatening due to high voltage.
Make sure that this work is only carried out by qualified and trained
personnel.
Observe safety instructions.
NOTE!
Disconnect the device before starting to work!
NOTE!
i
The surface of the housing is sensitive to aggressive cleaning agents, solvents
and abrasive media.
Do not use aggressive cleaning agents or solvents to clean the module.
Use only a slightly moist cloth.