![Crestron UPX-2 Operation Manual Download Page 5](http://html.mh-extra.com/html/crestron/upx-2/upx-2_operation-manual_2683681005.webp)
Universal Presentation Processor
Crestron
UPX-2
UPX-2 Quick Start
Introduction
The following steps are designed to guide you through the basic hookup,
configuration and loading of the demo program. The demo program contains files
required by the UPX-2 and the 2-Series control system.
Required Equipment
The following equipment is required to load and run the demo program.
•
UPX-2 Universal Presentation Processor.
•
2-Series control system with CUZ file version 3.137 or later.
•
DTT DualTouch touchpanel
•
PS/2
®
keyboard (not included)
•
PS/2 mouse (not included)
•
USB cable for connecting UPX-2 to DTT DualTouch touchpanel
(included with DTT DualTouch touchpanel)
•
RGB cable for connecting UPX-2 to DTT DualTouch touchpanel
(included with DTT DualTouch touchpanel)
•
Power cables (included with UPX-2 and DTT DualTouch touchpanel)
•
Cresnet
®
cable for connecting the UPX-2 to the 2-Series control system
(not included)
Hook Up
Refer to the following diagrams and connect the UPX-2 in the following order.
1. You must connect a PS/2 keyboard and mouse to the UPX-2 to establish
communication for the first time. After the initial setup, the mouse and
keyboard will not be required except for troubleshooting.
2. Connect the DTT-15V2 or DTT-17 to the UPX-2 using the supplied
DVI/RGB cable and USB cable. The DVI/RGB adaptor cable is connected
to RGB OUTPUT A. The USB cable is connected to a USB port on the
UPX-2.
Operations Guide – DOC. 6276B
Universal Presentation Processor: UPX-2
¥
iii