The Celeron™ Processor 3-7
8. Verify that all the feet of the clip are fully inserted and the clip
is firmly attached to the heat sink (see Figure 2-21).
9. Proceed to Step 3: To mount the Celeron processor.
Figure 3-7: Verifying that the clip is firmly attached to the heat sink.