![Coulomb Technologies ChargePoint CT2025 Installation Manual Download Page 38](http://html1.mh-extra.com/html/coulomb-technologies/chargepoint-ct2025/chargepoint-ct2025_installation-manual_2672974038.webp)
ChargePoint® Charging Stations
4-4
Step 3 - Connect lamp wiring to head assembly
Connect the 802.15.4 cable (black
cable with a yellow band) to the top of
the head assembly, ensuring that the
bend in this cable is positioned towards
the back.
If you are installing a gateway station,
connect the modem cable (black cable
without a yellow white band) to the rear
connector and finger-tighten.
Connect the black
cable without the
yellow band to the
connector at the
back (only gateway
stations have this
cable)
Connect the black
cable (with the
yellow band) to the
connector at the
front
If you have not
already done so,
wrap these wires
using a tie wrap
and secure to the
tie wrap anchor