![Coulomb Technologies ChargePoint CT2025 Installation Manual Download Page 20](http://html1.mh-extra.com/html/coulomb-technologies/chargepoint-ct2025/chargepoint-ct2025_installation-manual_2672974020.webp)
ChargePoint® Charging Stations
2-12
Step 6 - cont’d
• Install brackets to stabilize the
bollard. To do so, loosely
secure the body to the
mounting pole by aligning the
top front bracket with its
corresponding back bracket
and tightening its two screws
with a Philips screwdriver.
Repeat for the bottom front
bracket.
• While ensuring the body is
level, tighten all four screws on
the front brackets using a
Philips screwdriver.
IMPORTANT:
Ensure the
body is firmly aligned to the bottom
surface and that no movement
(rocking) can take place, even
when significant pressure is
applied.