Installation and service manual: Postmix tower
Ribbon
30
Cornelius Deutschland GmbH
Document no. TD0000100
Version: 06/11/2017, Index 0
5.
Pull out the tubes and cables through the opening of the
supporting structure in an upward motion.
6.
Lift the unit and seal off the supporting structure and
pack it as described in
5.7
Removing the E-Box
1.
Remove the fastening screws (Figure 28/1) used to keep
the E-Box (Figure 28/2) in place.
2.
Pack the E-Box as described in
Figure 27
Prerequisites
Reference
The unit has been disconnected from the
power supply.
Figure 28
1
2