![CoolBot Walk-in Cooler Construction Manual Download Page 8](http://html.mh-extra.com/html/coolbot/walk-in-cooler/walk-in-cooler_construction-manual_2660815008.webp)
PHONE: 888-871-5723
2018 © Store It Cold, LLC.
Rev 2018-9a
All Rights Reserved.
WALK-IN INSTALLATION WITH A FLOOR OPTION
YOUR WALK-IN COOLER PANELS, DOOR, SCREEDING OR OUTDOOR PACKAGE PARTS MIGHT
DIFFER IN DESIGN OR LOOKS FROM THE ONES SHOWN IN THIS MANUAL.
1.
Set the floor panels according to the Set-up drawing included in your documentation.
All panels have labels, and are identified in the Set-up drawing.
2.
Make sure that all floor panels are level. If not, using shims under cam-locks of the floor
panels around the outside edge is suggested to level the floor.