![CoolBot Walk-in Cooler Construction Manual Download Page 11](http://html.mh-extra.com/html/coolbot/walk-in-cooler/walk-in-cooler_construction-manual_2660815011.webp)
PHONE: 888-871-5723
2018 © Store It Cold, LLC.
Rev 2018-9a
All Rights Reserved.
TIPS FOR PROPER DOOR INSTALLATION
•
Level and plumb door frame and frame legs are level to each other. Shim under
door frame or floor to achieve level and plumb.
•
Frame legs are to be in plane with each
other. Check with 4’
straight edge across
door face at bottom of doorway.
•
Frame legs are parallel and not spread out. Opening width at bottom of doorway
to match width at top of doorway.
•
Adjust door closer per instruction manual.
•
Verify function of door locks and emergency
•
release when door is locked.
•
Door sweep lightly drags on floor when opening/closing door.
8.
Proceed to install the rest of the wall panels in the same way the other wall panels
where installed,
leaving the Front left corner for last.