![CoolBot Walk-in Cooler Construction Manual Download Page 25](http://html.mh-extra.com/html/coolbot/walk-in-cooler/walk-in-cooler_construction-manual_2660815025.webp)
PHONE: 888-871-5723
2018 © Store It Cold, LLC.
Rev 2018-9a
All Rights Reserved.
A/C INSTALLATION INTRUCTIONS
This is a quick, simple guide to install your LG unit in your Cooler enclosure.
Please read the OWNER’S MANUAL supplied with your A/C unit to familiarize yourself with the
PROPER operation, maintenance, usage, and installation of your A/C unit.
1.
Carefully unpack your A/C unit out of the box. Make sure the unit remains in the correct
position. DO NOT stand the box or the A/C unit on the side, back or front. DO NOT
discard any of the contents inside the box.
2.
Once your unit is out of the box, remove the 4 screws which fasten the cabinet at both
sides and back.
3.
Slide the unit from the cabinet by gripping the base pan handle and pulling forward
while bracing the cabinet.
4.
Carefully insert the A/C cabinet on the pre-cut hole from the inside of the cooler and
slide towards the outside until the top bracket of the cabinet touches the wall panel.
5.
Ensure that the cabinet has a slight tilt downward towards the outside. Position the
cabinet so that the b
ack is about ½”
to
1”
lower than the front. Use the holes at the