![CoolBot Walk-in Cooler Construction Manual Download Page 23](http://html.mh-extra.com/html/coolbot/walk-in-cooler/walk-in-cooler_construction-manual_2660815023.webp)
PHONE: 888-871-5723
2018 © Store It Cold, LLC.
Rev 2018-9a
All Rights Reserved.
5.
Continue the same way installing horizontal rows of 3 anchors around
every 24 inches
as
you
unroll and pull tight
on the membrane each time you are screwing a new row of
anchors.
8.
Starting at the front of the cooler, pull down on the membrane and secure to the wall by
installing the metal trimming provided. Screw the metal trimming to the front side using
the self-drilling hex sheet metal screws provided in your installation kit.
IMPORTANT!
Make sure the trim is level and
below the seam
in between the wall panel
and the ceiling panel
. It’s important that this seam stays un
der the membrane.