![CoolBot Walk-in Cooler Construction Manual Download Page 19](http://html.mh-extra.com/html/coolbot/walk-in-cooler/walk-in-cooler_construction-manual_2660815019.webp)
PHONE: 888-871-5723
2018 © Store It Cold, LLC.
Rev 2018-9a
All Rights Reserved.
INSTALLATION OF OUTDOOR PACKAGE
(OUTDOOR UNITS ONLY)
YOUR WALK-IN COOLER PANELS, DOOR, SCREEDING OR OUTDOOR PACKAGE PARTS MIGHT
DIFFER IN DESIGN OR LOOKS FROM THE ONES SHOWN IN THIS MANUAL.
Electrical Installations should be done AFTER your outdoor membrane
has been installed.
Outdoor units that will be exposed to rain and snow have been ship with an A/C hood, a roof
membrane and a hardware kit as part of your outdoor package.
Install the A/C hood before your roof membrane
.
Included items of your outdoor package:
1.
A/C hood
2.
Roof Membrane
–
pre-cut about 1 ft larger on each side
3.
Aluminum Flat Bars - predrilled
4.
Installation Hardware:
a.
Flat Bar Anchors (S/S or hex metal screws)
b.
Truss-Plate Anchors (black long screws)
5.
Truss Plates (only to be used in coolers with a side equal or greater than 10 ft)
RAIN HOOD (OUTDOOR UNITS ONLY)
Align the top edge of the hood no more than 2
”
below the horizontal joint in between the
ceiling panel and the wall panel. Make
sure it’s center in position with respect to the A/C
opening. Screw in place with the self-drilling metal screws.