![CoolBot Walk-in Cooler Construction Manual Download Page 21](http://html.mh-extra.com/html/coolbot/walk-in-cooler/walk-in-cooler_construction-manual_2660815021.webp)
PHONE: 888-871-5723
2018 © Store It Cold, LLC.
Rev 2018-9a
All Rights Reserved.
5.
After the membrane has been correctly installed and secured to the sides of your cooler,
you can trim with a utility knife the excess fabric below the trim if desired. This will give a
cleaner and more professional look but it is not necessary.
6.
Caulk with silicone the top edge of the trimming bars for added protection.
7.
Your cooler is now set up for outdoor use.
MEMBRANE INSTALLATION
IF YOUR COOLER IS 2” FROM A WALL
MEMBRANE INSTALLATION ON LARGE COOLERS - ONE SIDE MEASURING 10FT OR MORE
1.
Extend your membrane on the roof of your walk-in with the soft
smooth semi-glossy
textured side UP (overlapping seams DOWN)
. Ensure that it hangs approximately the
same amount on all sides. Don’t worry if it is too long, it can be trimmed after it’s
installed in place.