Notes on the instruction manual
15
4. Commission the device.
Programming is carried out via the
programming button [1].
[1] Programming button is on the
rear
[2] LED is on the front
5. Turn the device into the correct
installation position.
– The bus connection terminal [1]
must be at the rear at the bottom.
6. Snap the device into the support ring.
Carry out the electrical connection
according to the circuit diagram.
Fig. 6:
Connection of bus coupler
KNX
24 V DC