EMS-96
Instruction Manual
IM1200-U v1.6
Pag. 8 / 48
It is mandatory to connect the current input I1 and
voltage input VL1.
WARNING: If the instrument has the TTA on the current
inputs, DON’T connect the S2 terminals to the earth.
The electrical parameters are measured for individual
loads.
For correct calculation of power and energy, is mandatory
to connect the voltage inputs related to the used current
inputs.
WARNING: If the instrument has the TTA on the current
inputs, DON’T connect the S2 terminals to the earth.
If necessary to apply a multiplier factor “K” to adapt the
measure read, please consider that only one K for
voltages and only one K for currents can be set.
WARNING: If the instrument has the TTA on the current
inputs, DON’T connect the S2 terminals to the earth.
Single-Phase, 3 loads in 3 different networks, 6-Wires Configuration
Two-Phase, 3-Wires Configuration
Single-Phase, 2-Wires Configuration
Single-Phase, multiple loads in the same network, 2-Wires Configuration
LOAD
N
L1
EMS
P2
S2
P1
S1
S1
S1
S2
S2
S2
S1
N
VL
3
VL
2
VL
1
In
I3
I2
S1
S2
I1
LOAD
N
L1
LOAD
N
L1
LOAD
N
L1
EMS
S1
S1
S2
S2
S2
S1
N
VL
3
VL
2
VL
1
In
I3
I2
S1
S2
I1
P2
S2
P1
S1
P2
S2
P1
S1
P2
S2
P1
S1
LOAD
EMS
N1
L1
S1
S1
S2
S2
S2
S1
N
VL
3
VL
2
VL
1
In
I3
I2
S1
S2
I1
LOAD
N2
L2
LOAD
N3
L3
P2
S2
P1
S1
P2
S2
P1
S1
P2
S2
P1
S1
LOAD
N
L1
L2
EMS
P2
S2
P1
S1
S1
S1
S2
S2
S2
S1
N
VL
3
VL
2
VL
1
In
I3
I2
S1
S2
I1
P2
S2
P1
S1