
5
PC1000i Crimper – Operator Manual
PC1000i Crimper with CrimpIQ™ Controller
PC1000i Initial Crimper Setup
Hydraulic Oil Check:
Check the hydraulic oil level in the sight
glass window on the front of the reservoir.
Notes:
• The reservoir requires 45 gallons of ISO grade 46 hydraulic
oil for complete fill.
• If necessary, oil can be drained from either of the two ports
at the rear bottom of the reservoir.
Voltage Tag Check:
Check electrical circuit to be certain that
it matches the crimper’s requirements
shown on the voltage tag attached to the
crimper
cord.
Notes:
• Plug the PC1000i crimper directly into the appropriate electrical circuit/wall outlet.
• Electrical Requirements:
7.5HP/230V/3Phase (20 Amp)
7.5HP/440V-480V/3Phase (20 Amp)
5HP/230V/1Phase (30 Amp)
Caution:
Do not run the crimper on an extension cord as low voltage
can damage the motor and/or electrical components.
Rotation of the Motor
Check to be certain that the motor rotates
Check:
in the direction of the arrow shown on the
motor
housing.
Caution:
Damage to the pump can result if the motor does not rotate
in the correct direction.
PC1000i Initial Crimper Setup