W415-1283 / F / 04.30.18
84
FR
exigences minimum d'évacuation
90°
90°
45°
V
1
H
1
H
4
90°
90°
H
3
H
2
V
2
90°
90°
45°
V
1
H
1
H
2
COURSE
VERTICALE
REQUISE
EN POUNCES
(MILLIMETERS)
V
T
0
5
(1.5)
15
(4.6)
20
(6.1)
100 (2540)
50 (1270)
150 (3810)
12.5
(3.8)
57 (1447.8)
147 (3733.8)
10
(3.1)
0
2.5
(0.8)
5
(1.5)
7.5
(2.3)
10
(3.1)
12.5
(3.8)
15
(4.6)
40 (12.2)
10 (3.1)
20 (6.1)
30 (9.1)
17.5
(5.3)
20
(6.1)
39 (11.9)
REQUIRED
VERTICAL
RISE IN FEET
(METERS)
V
T
HORIZONTAL VENT RUN PLUS OFFSET IN
FEET (METERS)
H
T
LONGUEUR DES COURSES HORIZONTALES
PLUS LES DÉVIATIONS EN PIEDS (MÉTRES)
H
T
90°
90°
45°
V
1
H
1
H
4
90°
90°
H
3
H
2
V
2
90°
90°
45°
V
1
H
1
H
2
COURSE
VERTICALE
REQUISE
EN POUNCES
(MILLIMETERS)
V
T
0
5
(1.5)
15
(4.6)
20
(6.1)
100 (2540)
50 (1270)
150 (3810)
12.5
(3.8)
57 (1447.8)
147 (3733.8)
10
(3.1)
0
2.5
(0.8)
5
(1.5)
7.5
(2.3)
10
(3.1)
12.5
(3.8)
15
(4.6)
40 (12.2)
10 (3.1)
20 (6.1)
30 (9.1)
17.5
(5.3)
20
(6.1)
39 (11.9)
REQUIRED
VERTICAL
RISE IN FEET
(METERS)
V
T
HORIZONTAL VENT RUN PLUS OFFSET IN
FEET (METERS)
H
T
LONGUEUR DES COURSES HORIZONTALES
PLUS LES DÉVIATIONS EN PIEDS (MÉTRES)
H
T
16.5_2A
(H
T
) > (V
T
)
Lorsque la confi guration de l’évacuation exige plus d’un coude de 45° et 90°, les formules suivantes
s’appliquent :
Formule 1 : H
T
<
4,2 V
T
Formule 2 : H
T
+ V
T
<
24,75 pieds (7,5m)
Exemple :
V
1
= 4 PI (1,2m)
V
2
= 1,5 PI (0,5m)
V
T
=
V
1
+
V
2
= 4 PI (1,2m) + 1,5 PI (0,5m) = 5,5 PI (1,7m)
H
1
= 2 PI (0,6m)
H
2
= 1 PI (0,3m)
H
3
= 1 PI (0,3m)
H
4
= 1,5 PI (0,5m)
H
R
=
H
1
+
H
2
+
H
3
+
H
4
= 2 PI (0,6m) + 1 PI (0,3m) + 1 PI (0,3m) + 1,5 PI (0,5m) = 5,5 PI (1,7m)
H
O
= 0,03 (un coude 45º + quatre coudes 90º - 135 °) = 0,03 (405 - 135°) = 8,1 PI (2,5m)
H
T
=
H
R
+
H
O
= 5,5 PI (1,7m) + 8,1
PI (2,5m)
= 13,6 PI (4,2m)
H
T
+
V
T
= 13,6 PI (4,2m) + 5,5 PI (1,7m) = 19,1 PI (5,8m)
Formule 1 : H
T
<
4,2 V
T
4,2 V
T
= 4,2 PI (1,3m) x 5,5 PI (1,7m) = 23,1 PI (7m)
13,6 PI (4,2m) < 23,1 PI (7m)
Formule 2 : H
T
+ V
T
<
24,75 PI (7,5m)
19,1 PI (5,8m) < 24,75 PI (7,5m)
Puisque les deux formules sont respectées, cette confi guration d’évacuation est acceptable.
90°
90°
45°
V
1
H
1
H
4
90°
90°
H
3
H
2
V
2
90°
90°
45°
V
1
H
1
H
2
COURSE
VERTICALE
REQUISE
EN POUNCES
(MILLIMETERS)
V
T
0
5
(1.5)
15
(4.6)
20
(6.1)
100 (2540)
50 (1270)
150 (3810)
12.5
(3.8)
57 (1447.8)
147 (3733.8)
10
(3.1)
0
2.5
(0.8)
5
(1.5)
7.5
(2.3)
10
(3.1)
12.5
(3.8)
15
(4.6)
40 (12.2)
10 (3.1)
20 (6.1)
30 (9.1)
17.5
(5.3)
20
(6.1)
39 (11.9)
REQUIRED
VERTICAL
RISE IN FEET
(METERS)
V
T
HORIZONTAL VENT RUN PLUS OFFSET IN
FEET (METERS)
H
T
LONGUEUR DES COURSES HORIZONTALES
PLUS LES DÉVIATIONS EN PIEDS (MÉTRES)
H
T
Consultez le graphique pour déterminer la
course verticale nécessaire
V
T
par rapport à la
course horizontale requise
H
T
.
La section ombragée à l’intérieur des lignes
représente des valeurs acceptables pour
H
T
et
V
T
Confi guration d’évacuation simple (un coude de 45º et
de 90°seulement)