background image

  

4 

V) POWER UP & TESTING  

1. 

Close the enclosure door and secure screws on the front panel.  

2. 

Make sure power supply to the fan Control system is OFF.  Turn ON the 24 VAC 
power to the P2621-NO2/VC unit.  

3. 

The green POWER light should turn ON.  The word –FAN- should appear in the 
LCD display.  After several minutes the LCD display will display the current 
Nitrogen Dioxide (NO2) reading in parts per million (ppm).   

NOTE: After the P2621-NO2/VC has been OFF, when power is restored to the 
unit, -FAN- will appear in the LCD display and the unit will run ventilation fan 
for several minutes to clear the air of accumulated Nitrogen Dioxide (NO2) and 
then return to normal operation.  

4. 

Turn OFF the power to the P2621-NO2/VC.  Turn ON the power to the 
ventilation fan Control system.  Then turn on the power to the P2621-NO2/VC.  
The green POWER light should turn ON.  The word –FAN- should appear in the 
LCD display.  After several minutes, the LCD will display the current Nitrogen 
Dioxide (NO2) reading in ppm.  

VI) Regular Maintenance  

To ensure the sensor is operating correctly and performing proper gas detection, it is 
extremely important for the user to verify the sensor is responding correctly to the NO2 
gas at a regular interval. Conspec stipulates a gas injection into the sensor and verify the 
response of the sensor for every THREE MONTHS of operation.  

To perform an actual gas verification, simply inject a known concentration of certified 
NO2 test gas (recommended 10 PPM of NO2 gas balance with Air) into the sensor. After 
injecting the test gas into the sensor for FOUR minutes, verify the reading displayed on 
the 3-digit LCD. If the reading displayed on the LCD is within 2% of the NO2 gas 
injected (if 10 PPM of NO2 Gas is used, then the reading should read between 8 to 12 
PPM), then the sensor is operating correctly and no further calibration will be required. 
The user can also verify that the Controller is performing its Control function correctly by 
noticing the ventilation fan is turned ON when the gas reading exceeds 1 PPM. (If the 10 
PPM NO2 test gas is maintained into the sensor for more than 15 minutes, an audible 
piezo horn will be sounded). At the end of verification, if the user wishes to clear the 
alarm NO2ndition faster, zero gas can be injected into the sensor for 2 minutes to purge 
the sensor. 

 

At the end of four minutes after the test gas was injected into the sensor, if the reading on 
the 3-digit LCD deviates from the actual concentration of the test gas by more than 2%, 
then proper calibration of the sensor will be required. The user can purchase a calibration 

Summary of Contents for P2621-NO2/VC

Page 1: ...Conspec Controls Inc P2621 NO2 VC Nitrogen Dioxide Ventilation Fan Controller Operations Manual Conspec Controls Inc 1 800 487 8450...

Page 2: ...the relay coil is energized whenever the P2621 NO2 VC is in a non alarm condition and the normally open contact terminal connections K1 K2 is held closed When any fault occurs the Fan relay is de ene...

Page 3: ...ystem design and installation Zoned systems are easily created when several sets of fans need to be controlled independently 1 Be sure to turn OFF power to fan Control system and 24 VAC power supply b...

Page 4: ...t a regular interval Conspec stipulates a gas injection into the sensor and verify the response of the sensor for every THREE MONTHS of operation To perform an actual gas verification simply inject a...

Page 5: ...g three door retaining screws Open the door of the P2621 NO2 VC and locate the 20 header pin Connector marked J2 in the middle of the left edge of the P2065 Smart Monitor Card Plug the P2621 P program...

Page 6: ...sensor Press Key 4 once to accept the ZERO GAS calibration If the reading on LCD is outside the range of 25 100 the monitor should be sent back to the factory for in house calibration The message SCAL...

Page 7: ...ector on the P2065 Smart Monitor Card Clip the wire tie securing the cable to the lower left hand corner of the P2065 Smart Monitor Card and discard Grasp the ring protruding from the bottom of the P2...

Page 8: ...should be closed low or zero resistance If the circuit is not closed return the P2621 NO2 VC to your supplier or CONSPEC for repair or replacement If the above resistance checks between terminals K1 a...

Page 9: ...A Current Source Control Outputs Optional Strobe TB1 V Strobe P2065 J3 OUT 4 First Alarm Piezo TB1 V Piezo P2065 J3 OUT 3 Second Alarm NOTE The Control Outputs are open collector transistors limited t...

Reviews: