background image

Place one of the 

deck connectors 

[F] over the upper 

handrail post and 

slide down.  Check 

to make sure side 

marked [This Side 

down] is  

facing downward. 

Repeat to install the  

second part [F] 

Step 15

To install the upper 

handrail posts [E] first 

locate the openings 

on panel [A]  marked 

with #3. Next insert 

the tabs on part [E] all 

the way into the open-

ings then tap down 

with a rubber mallet 

until seated. Repeat 

to install the other 

part [E].

Step 13

The top tread [I-3] will 

install slightly differ-

ent than the previous 

two. Install this tread 

by placing over the 

four tabs located on 

side panels [A]. Using 

a rubber mallet strike 

the top of the tread 

directly over the tabs 

until seated.

Step 14

With the step in place and positioned about 

1 inch away from inside of pool wall [

back 

of step must not touch pool liner

] extend the two deck con-

nectors onto the pool deck and attach to the handrail posts 

using 2- #10 x 1-1/4” screws through the deck connectors 

and into the posts. If you have a wood deck attach the deck 

connectors to the pool deck using 2-#10 x 1-1/4 screws  in 

each connector. If your pool deck is concrete consult with 

your local hardware store for the proper anchors and screws.

Step 18

Step 16 (Cont.)

Using a Phillips head screwdriver install one of the  

#10 x 1-1/4” stainless screws at each location [4 total].  

[HAND TIGHTEN ONLY]

With your Curve step fully 

assembled locate the [4] 

recessed screw locations on 

the top tread. With a cordless 

drill, at each of these [4]  

locations drill a 

small 1/8” pilot 

hole completely 

through the tread 

and into the  

sidewall below.

Step 16 (Cont.)

WARNING!

  

Using a corded drill near pool 

may result in electrocution.

With a helper place the pool step into 

swimming pool. 

WARNING! 

Pool step will be heavy. Have additional 

help. Do not attempt to place the step by yourself.

Hold the step under water at a slight angle until all the air 

bubbles stop. Tilt the step in the other direction until all the 

air bubbles stop. Be patient this process will take a few  

minutes.

 

If the pool step is still floating all of the air is not 

out. Lean step to the side again until air bubbles stop.

Step 17

4

Place handrails [G] 

over the top of hand-

rail posts, push down 

to lock in place.

Step 16

WARNING! 

DO NOT LIFT 

THE STEP BY 

HANDRAILS!

Summary of Contents for CCX-IG

Page 1: ...r Installer Read Safe Installation on p 2 and all instructions before beginning For proper assembly and installation instructions must be followed completely Homeowner Read Safe Use on back cover before using Save these instructions WEIGHT LIMIT 400 LBS Assembly video available online www conferplastics com Model CCX IG Curve Step Note 40 lbs of sand required Model CCX IG System Curve Step System ...

Page 2: ... lifting awkward or heavy loads have another person help you Double check after installation Before using the product after assembly and installation go over the instructions and procedures again to make sure nothing has been overlooked Make sure that safety labels are installed and legible Stand up both side panels A Insert panel brace B with vent hole up into opening located on A then push down ...

Page 3: ...n the bottom edges Apply a little liquid soap on the 4 tabs to help with installing foot pads Rotate 90 Step 7 The two back foot pads H will always be installed with 1 facing up Place part H over the rounded tab strike with a rubber mallet until seated onto the rounded tab Repeat to install second part H Step 3 While holding lower tabs in part A align the top tabs then tap down with a rubber malle...

Page 4: ...he pool deck using 2 10 x 1 1 4 screws in each connector If your pool deck is concrete consult with your local hardware store for the proper anchors and screws Step 18 Step 16 Cont Using a Phillips head screwdriver install one of the 10 x 1 1 4 stainless screws at each location 4 total HAND TIGHTEN ONLY With your Curve step fully assembled locate the 4 recessed screw locations on the top tread Wit...

Page 5: ...iser M Slide the step support N under then rotate up making sure part is in notch Step 24 Additional Parts for Step Add On 2 Foot pads Part H 1 Add on panel Part J 1 Short hand rail post Part K 1 Long hand rail post Part L 1 Large flex riser Part M 1 Tread support Part N 1 Large curved tread Part O 1 Medium flex riser Part P 1 Medium curved tread Part Q 1 Small flex riser Part R 1 Small curved tre...

Page 6: ...el fill the lower hole completely to the top with sand Shake the panel to help settle the sand Lower hole must be completely filled Using the provided caps plug both the lower and upper fill hole Step 25 Fill Holes Next install the medium flex riser P by sliding down into the slot located on the add on panel J Insert the tab located on the end of flex riser into the opening on side panel A Riser w...

Page 7: ... over the upper handrail posts and slide down Check to make sure the side marked this side down is facing downward Step 39 Place handrails G over the top of handrail posts and push down to lock in place Step 40 7 Step 38 Cont With your Curve step fully assembled locate the 4 recessed screw locations on the top tread At each of these locations 4 total drill a 1 8 pilot hole completely through the t...

Page 8: ...fic legal rights and you may also have other rights which may vary from state to state Confer Plastics Inc 97 Witmer Road North Tonawanda N Y 14120 2421 97 Witmer Road North Tonawanda New York 14120 2421 Toll Free U S 800 635 3213 FAX 716 694 3102 www conferladders com WINTERIZING REMOVING STEP FROM POOL PLAN AHEAD PEOPLE WILL HAVE TO GET IN THE POOL TO MOVE OR REMOVE THE STEP When winterizing you...

Reviews: