background image

CONFER CURVE STEP ADD-ON INSTRUCTIONS (Cont’d.)

Install the second tread 

[I] onto the base step 

 Step 33

Install the long hand-

rail post [L] into the 

opening on the add-on 

panel [J] marked with #3 next to it. Push 

the tab all the way in then tap down to 

lock in place.

Step 34

Install the small flex  

riser [R]

Step 35

Place the small curved 

tread [S] over the hand-

rail post and attach the same as in step 32.

Step 36

Install the lower and 

upper handrail posts [E]  

      to the left side panel by  

        repeating steps 12  

           and 13.

Step 37

Repeat step 14 to 

install the top tread  

[1-3].

Step 38

Place both deck  
connectors [F] over the 

upper handrail posts and slide down.  
Check to make sure the side marked [this 
side down] is facing downward.

Step 39

Place handrails [G] 

over the top of handrail 

posts and push down 

to lock in place.

Step 40

7

Step 38 (Cont.)

With your Curve step fully assembled locate the [4] 

recessed screw locations on the top tread. At each of 

these locations [4 total] drill a 1/8” pilot hole completely 

through the tread and into the step sidewall below.

 Step 38 (Cont.)

Using a Phillips head screwdriver install one of the  

#10 x 1-1/4” stainless screws at each location [4 total].  

[HAND TIGHTEN ONLY]

TO COMPLETE STEP AND 
PLACE IN POOL FOLLOW  
STEPS 17 THROUGH 18 ON 
PAGE 4 OF THE INSTRUCTIONS. 
NO ADDITIONAL SCREWS 
NEEDED FOR ADD-ON 
CURVED TREADS.

WARNING!

  

Using a corded 

drill near pool 

may result in 

electrocution.

Summary of Contents for CCX-IG

Page 1: ...r Installer Read Safe Installation on p 2 and all instructions before beginning For proper assembly and installation instructions must be followed completely Homeowner Read Safe Use on back cover before using Save these instructions WEIGHT LIMIT 400 LBS Assembly video available online www conferplastics com Model CCX IG Curve Step Note 40 lbs of sand required Model CCX IG System Curve Step System ...

Page 2: ... lifting awkward or heavy loads have another person help you Double check after installation Before using the product after assembly and installation go over the instructions and procedures again to make sure nothing has been overlooked Make sure that safety labels are installed and legible Stand up both side panels A Insert panel brace B with vent hole up into opening located on A then push down ...

Page 3: ...n the bottom edges Apply a little liquid soap on the 4 tabs to help with installing foot pads Rotate 90 Step 7 The two back foot pads H will always be installed with 1 facing up Place part H over the rounded tab strike with a rubber mallet until seated onto the rounded tab Repeat to install second part H Step 3 While holding lower tabs in part A align the top tabs then tap down with a rubber malle...

Page 4: ...he pool deck using 2 10 x 1 1 4 screws in each connector If your pool deck is concrete consult with your local hardware store for the proper anchors and screws Step 18 Step 16 Cont Using a Phillips head screwdriver install one of the 10 x 1 1 4 stainless screws at each location 4 total HAND TIGHTEN ONLY With your Curve step fully assembled locate the 4 recessed screw locations on the top tread Wit...

Page 5: ...iser M Slide the step support N under then rotate up making sure part is in notch Step 24 Additional Parts for Step Add On 2 Foot pads Part H 1 Add on panel Part J 1 Short hand rail post Part K 1 Long hand rail post Part L 1 Large flex riser Part M 1 Tread support Part N 1 Large curved tread Part O 1 Medium flex riser Part P 1 Medium curved tread Part Q 1 Small flex riser Part R 1 Small curved tre...

Page 6: ...el fill the lower hole completely to the top with sand Shake the panel to help settle the sand Lower hole must be completely filled Using the provided caps plug both the lower and upper fill hole Step 25 Fill Holes Next install the medium flex riser P by sliding down into the slot located on the add on panel J Insert the tab located on the end of flex riser into the opening on side panel A Riser w...

Page 7: ... over the upper handrail posts and slide down Check to make sure the side marked this side down is facing downward Step 39 Place handrails G over the top of handrail posts and push down to lock in place Step 40 7 Step 38 Cont With your Curve step fully assembled locate the 4 recessed screw locations on the top tread At each of these locations 4 total drill a 1 8 pilot hole completely through the t...

Page 8: ...fic legal rights and you may also have other rights which may vary from state to state Confer Plastics Inc 97 Witmer Road North Tonawanda N Y 14120 2421 97 Witmer Road North Tonawanda New York 14120 2421 Toll Free U S 800 635 3213 FAX 716 694 3102 www conferladders com WINTERIZING REMOVING STEP FROM POOL PLAN AHEAD PEOPLE WILL HAVE TO GET IN THE POOL TO MOVE OR REMOVE THE STEP When winterizing you...

Reviews: