5
Scope of Delivery
Cables and plugs, as well as material for mounting the device to a supporting structure (i.e. screws etc.) are not included in the
scope of supply. Refer to chapter 14 for more information.
6
Transport and Storage
WARNING!
The transport company must be advised about any damage that has been detected after delivery. Prior to
installing or starting operation with damaged components please consult the supplier.
Refer to chapter 4 for required transport and storage conditions.
7
Installation
7.1
Who is Authorized to Carry out the Installation
All installation and commissioning work as well as maintenance work and disassembly have to be carried
out by qualified staff (IEC 364 respectively CENELEC HD 384 or DIN VDE 0100 and IEC 664 or DIN VDE
0110 and national safety rules).
Qualified staff according to the safety regulations are persons who are familiar with the assembly and
installation of the energy supply system and who have the appropriate qualifications.
7.2
General Advice for the Installation
WARNING!
After receipt of the components, and prior to starting the installation work:
•
Unpack the components and check carefully for damage that may have occurred during transport or
storage (damage to housings and insulation, missing parts etc.).
•
Check data on the identification plate to make sure that the components meet the requirements with
regard to nominal power and voltage and that they are matching parts to the Pickup used.
•
Check completeness of the documents and conformity with the delivered components.