18
To cancel the RINSE step, press the REGEN button. The FILL (brine tank) step appears
Wait for this step
Rinse the second filter by proceeding as described above for the first filter.
After completing the FILL step, check whether the water in the brine tank is at
least approx. 20 mm above the salt carrier bottom or higher (visible through the
semi-transparent container wall).
The water should be at least approx. 20 mm above the salt carrier bottom after the second
regeneration run. Otherwise, check the parameter settings of the control unit, where Step
14 „Filling quantity“, must be set correctly. After correcting the „Filling quantity“ parameter,
following the specifications in the appendix, start another regeneration and proceed as
described above once again until the „Fill“ step is completed.
5.1.3
Establishing the operating state
Fill the brine tank with the regenerating salt and distribute it evenly on the salt
carrier bottom
Open the shut-off valves in the raw and soft water lines so that water can be drained
Throttle the soft water quantity at the soft water shut-off valve so that the max. flow rate
is not exceeded. Otherwise, the system will be hydraulically overrun, which may result in
a residual hardness increase. In the absence of a flow or quantity indicator, the flow rate
must be determined by gauging.
Commissioning and Decommissioning
INSTRUCTION
Only evaporated salt as per DIN EN 973 is suitable for regeneration. Exclusive use of tablet
salt of higher purity according to DIN EN 973, type A is recommended.
INSTRUCTION
The flow rate limitation must not be carried out in the raw water pipe, otherwise not enough
water can be drained for regeneration.
INSTRUCTION
When using fine-grained evaporated salt, a gauze cloth (mesh size 200 μm), cut to size,
must be placed on the salt carrier bottom. The gauze cloth must cover the entire salt carrier
bottom with no gaps, be guided upwards along the container walls and be held in place by
throwing it over the container collar before securing the lid.
Summary of Contents for CONDAIR SOFT
Page 31: ...31 Appendix 9 3 Electrical connection...
Page 48: ...48 9 5 1 Soft 60 System drawing Appendix...
Page 49: ...49 9 5 2 Soft 120 System drawing Appendix...
Page 50: ...50 9 5 3 Soft 200 System drawing Appendix...
Page 51: ...51 9 5 4 Soft 320 System drawing Appendix...
Page 52: ...52 9 5 5 Soft 400 System drawing Appendix...
Page 54: ...54 Notes...
Page 55: ...55 Notes...