Unpacking the system
Check the delivery to ensure it is complete and free from transport damage.
Transport the system to the intended location with care using suitable lifting equipment.
The installation is carried out on an installation surface in accordance with the requirements above.
4.2 Assembly
4.2.1
Necessary qualification of the assembly personnel
4.2.2
Washing the gravel
Systems of the sizes 60 to 200 are already filled with supporting gravel upon delivery.
For systems of size 320 and larger, proceed as follows:
To remove impurities, wash the supplied quartz gravel in a bucket under running water, stirring
constantly.
4.2.3
Positioning the container
Position the two pressure tanks and the salt dissolving tank and align them in accordance with
the drawing.
INSTRUCTION
Any deviations or damage must be reported to the supplier immediately.
Installation and assembly
INSTRUCTION
The water-side connection may be carried out by trained specialist personnel only.
General guidelines (DIN, DVGW, SVGW, ÖKGW) and local installation regulations
must be observed during system installation.
B
A
Brine tank
Summary of Contents for CONDAIR SOFT
Page 31: ...31 Appendix 9 3 Electrical connection...
Page 48: ...48 9 5 1 Soft 60 System drawing Appendix...
Page 49: ...49 9 5 2 Soft 120 System drawing Appendix...
Page 50: ...50 9 5 3 Soft 200 System drawing Appendix...
Page 51: ...51 9 5 4 Soft 320 System drawing Appendix...
Page 52: ...52 9 5 5 Soft 400 System drawing Appendix...
Page 54: ...54 Notes...
Page 55: ...55 Notes...