5 . 6 . 1 Tw o h o u r s a f t e r t h e f i r s t s t a r t
( c o n t i n u e d )
4
Check adjustment of the granulator motor
mounting bracket, check the screws “G” and
the nuts “H” to the adjusting screws.
Check that the nuts to the adjusting screws
are properly counter-tightened, and that they
locks the setting of the motor mounting
bracket. see section 7.3
5 . 6 . 2 2 0 - 3 0 h o u r s a f t e r t h e f i r s t s t a r t
1
Check condition and tension of the drive belts the first time after 20 to 30 hours
at normal load. Checking and adjusting tension of the drive belts is described in
section 7.3 “Transmission” in this instruction manual.
2
Check the tightening torque of the screws for the upper bracket of the jack
against the hopper. Tightening torque 140 Nm.
3
Check the tightening torque of the screws for the lower bracket of the jack
against the stand.
Jack 5000 N
M10 x 4 . . . . . . . . . . . . . . . . . tightening torque 45 Nm.
Jack 15000 N
M20 . . . . . . . . . . . . . . . . . . . tightening torque 300 Nm.
4
Check the tightening torque of the screws which holds the hopper against the
rear hinge, tightening torque 200 Nm.
5
Check the tightening torque of the screws which holds the locking rule on cutter
house door, tightening torque 200 Nm.
6
Ensure that the cutter housing is accurately in horizontal level.
IMPORTANT!
Ensure that all of the machine shoes carry load.
7
Make a thorough general inspection. Ensure that there are no loose parts,
screws, nuts or components on the machine.
Consult your Conair agent/dealer or Conair’s Corporate office in Pittsburgh,
Pennsylvania if there is any item that does not correspond to your expectations,
or if there is any part of the machine that is faulty or that requires attention or
repair.
G
H
G
NOTE:
Sign the executed
inspection in the machine
maintenance schedule.
NOTE:
Sign the executed
inspection in the machine
maintenance schedule.
5 - 1 0
l M a i n t e n a n c e