![Comtech EF Data MBT-5000 User'S Installation And Operation Manual Download Page 53](http://html1.mh-extra.com/html/comtech-ef-data/mbt-5000/mbt-5000_users-installation-and-operation-manual_2648432053.webp)
MBT-5000 L-Band Up/Down Converter System
MN-MBT5000
Upgrading Firmware
Revision 4
4–9
•
Type "
put FW-0000098X_MBT_#_#_#.bin bulk:
" (where “X”’ denotes the revision letter,
and “#_#_#” is the firmware version number) at the Command-line prompt, without
quotes, to begin the file transfer.
The destination “bulk” must be all lower-case.
Wait for approximately one minute while the transfer takes place. Once the file
transfers, Command-line displays the upload result, similar to:
200 Port command okay
150 Opening data connection.
226 File received OK – XXXXXXX bytes in XX.XXX sec
ftp: XXXXXXX bytes sent in XX.XXSeconds XXX.XXXKbytes/sec.
In the event you receive the “Connection closed by remote host.” message,
wait another minute before continuing. The firmware upload sometimes
takes longer than the FTP client allows.
As the upgrade process continues, the converter front panel displays:
Programming APP Flash…
Please wait
Programming main FPGA…
Please wait
•
Type "
bye
" to terminate the FTP session, and then close the Command-line window.
3)
Use the converter front panel menus, the MBT-5000 HTTP Interface ‘
Status | Status
’ page,
or issue the Serial Remote Interface
<0/SWR?
or
<0/FRW?
query as shown previously to
verify that the PC-to-Unit FTP file transfer was successful.
4)
Use the converter front panel menus or the the MBT-5000 HTTP Interface to select the
desired firmware image to boot from:
A.
Using the front panel menus: To select the desired Firmware Image, be sure you are first
in
LOCAL
mode (
SELECT: Config
Remote
Local
). Then, go to the
SELECT: Utility
Firmware
Select
branch. Use the
◄
►
arrow keys to select the
Next Reboot Image
as
#1
or
#2
. Press
ENTER
when done.
B.
Using the MBT-5000 HTTP Interface ‘
Config | Utility
’ page: Use the drop-down list to
select the
Next Reboot Image
as
1
or
2
. Click
[Submit]
to save.
5)
Cycle power to reboot the MBT-5000:
A.
On the MBT-5000 rear panel:
Turn off/disconnect the power source.
Summary of Contents for MBT-5000
Page 16: ...MBT 5000 L Band Up Down Converter System MN MBT5000 Preface Revision 4 xvi Notes...
Page 24: ...MBT 5000 L Band Up Down Converter System MN MBT5000 Introduction Revision 4 1 8 Notes...
Page 132: ...MBT 5000 L Band Up Down Converter System MN MBT5000 Appendix A Revision 4 A 8 Notes...
Page 136: ...MBT 5000 L Band Up Down Converter System MN MBT5000 Appendix B Revision 4 B 4 Notes...
Page 137: ......
Page 138: ...2114 WEST 7TH STREET TEMPE ARIZONA 85281 USA 480 333 2200 PHONE 480 333 2161 FAX...