background image

14 

 

 

 

 

 

 

Table 1.  MegaPulse Defib-5PF-002 Front Panel 

ITEM

 

NAME

 

FUNCTION

 

VOLTAGE

 Adjust Knob 

Adjust the digital voltage set point in the tester. 
Press  the  voltage  knob  to  display  the  voltage  set  point.  This  setting  will  blink  for  a 
few seconds on the front meter. 
Turn  Clockwise  to  increase  the  setting  Voltage  Setting  Point  before  pressing 

CHARGE

 button. 

POLARITY

 switch 

Disable 

NOR REV 

indicator 

Indicates the state of the Output Polarity switch.  

NOR

 indicates Normal (Positive) position.  

REV

 indicates Reverse (Negative) position. 

CHARGE

 switch 

Starts the charge process of the tester capacitor. 
The 

CHARGE

 indicator will turn off after the 

CHARGE

 switch is pressed, and the 

TRIGGER

 indicator will turn on. 

The charge process will stop after 2 minutes if the 

TRIGGER

 button is not pressed. 

CHARGE

 indicator 

This  Yellow  indicator  is  lit  to  show  that  pressing  the 

CHARGE

  switch  is  the  next 

logical step in a test sequence. 

CHARGE

  indicator  is  lit  when  the  tester  is  turn  ON  an  after  pressing 

TRIGGER

 

button. 

CHARGE

 indicator will go out after pressing 

CHARGE

 button. 

CHARGE

 and 

TRIGGER

 Indicators will be blinking if the Interlock Switch is open. 

(Only testers with Interlock Switch Option) 

TRIGGER

 switch 

Triggers the output impulse waveform. 
The impulse waveform will appear across the output leads. 

TRIGGER

 indicator 

This Red indicator is lit to show that the tester can be trigger. 

TRIGGER

 indicator is lit for 2 minutes after the 

CHARGE

 button is pressed. 

TRIGGER

 indicator will go out after pressing 

TRIGGER

 button. 

TRIGGER

 and 

CHARGE

 Indicators will be blinking if the Interlock Switch is open 

(Only testers with Interlock Switch Option) 

TRIGGER

 indicator will blink  at  when  the Voltage. This effect will remain on until 

the 

TRIGGER

 switch is pressed.  (Only testers with PC Interface option) 

VOLTAGE

 meter 

Displays the output voltage set point. 
The  voltage  reading  will  increase  from  zero  to  the  voltage  set  point  when  the 
CHARGE  button  is  pressed.  Note  that  the  Voltage  meter  may  indicate  that  some 
residual voltage is present on the main storage capacitor, even when the tester is first 
turned  ON.  This  is  due  to  inherent  charging  of  the  internal  capacitors.  Pressing  the 

TRIGGER

 switch will discharge the capacitors.  Note that the peak amplitude of the 

measured  output  waveform  is  proportional  to  the  voltage  that  is  read  of  the  front 
panel  of  the  MegaPulse,  but  it  will  always  be  somewhat  lower.  This  is  because  the 
meter  on  the  MegaPulse  is  measuring  the  voltage  on  the  main  impulse  storage 
capacitor. This voltage will intentionally dissipate to some extent before reaching the 
output leads.  
The  meter  will  start  to  flash  at 

7100V

  to  indicate  that  voltage  is  in  the  maximum 

limits. 
If unit includes PC Interface and the  Keyboard is locked, the display will show OFF 
when a button is pressed. 

500:1

 BNC 

500:1 reference to verify delivery of pulse 

10-19 

OUTPUTS 

10 Channel multiplexer outputs, each channel capable of delivering the pulse, channel 
activation is via commands on the back of the unit. 

Summary of Contents for MegaPulse Defib-5PF-002

Page 1: ...MegaPulse IMPULSE TESTER Defib 5PF 002 Instruction Manual...

Page 2: ...gn and ergonomic front panel and represents the latest in high voltage impulse testing To fully appreciate all the features of your new instrument we suggest that you take a few moments to review this...

Page 3: ......

Page 4: ...e Requirements 12 Fuse Replacement 12 Front and Rear Panel Features 13 Figure 5 MegaPulse Defib 5PF 002 Front Panel 13 Table 1 MegaPulse Defib 5PF 002 Front Panel 14 Figure 6 MegaPulse Defib 5PF 002 R...

Page 5: ...5...

Page 6: ...ept and creative at completing a path to ground Instructions should include a warning against any metal jewelry Operators should not allow others in the testing area especially when tests are being co...

Page 7: ...ed Note that the CHARGE process will stop after 2 minutes if the TRIGGER button is not pressed The MegaPulse tester is designed to bleed the high voltage away after the test has concluded In order to...

Page 8: ...ge capacitor This voltage will intentionally dissipate to some extent before reaching the output leads Therefore it is important to measure the peak amplitude of the output waveform and adjust the out...

Page 9: ...eter Your tester is warranted for a period of one year upon shipment of the instrument to the original purchaser Specifications Specifications for the MegaPulse Defib 5PF 002 are listed in the table b...

Page 10: ...10 Figure 1 Type A Diagram Figure 2 Type B Diagram...

Page 11: ...11 Figure 3 Impulse waveform type A Figure 4 Impulse waveform type B...

Page 12: ...r Remove the tester from its container and place it on a test bench AC Line Voltage Requirements AC line voltage requirements for your Tester are noted on the rear panel of the instrument Do not conne...

Page 13: ...me familiar with the use of its controls indicators and connectors The front panel features of the MegaPulse are shown in Figure and described in Table 1 The rear panel features of the MegaPulse are s...

Page 14: ...is lit for 2 minutes after the CHARGE button is pressed TRIGGER indicator will go out after pressing TRIGGER button TRIGGER and CHARGE Indicators will be blinking if the Interlock Switch is open Only...

Page 15: ...se and required supply voltage for 115V input 5 Interlock Switch Emergency Stop Close Enables the tester buttons for operation Open Stops any process in the tester and disables the buttons The TRIGGER...

Page 16: ...ment typically an oscilloscope with a high voltage probe Note that the RETURN lead is referenced to the chassis ground of the tester in this case we will connect channel 1 to the return of the probe c...

Page 17: ...and connect the tester to a proper source of supply using the included 18AWG power supply cord 2 Plug the leads to the Outputs of the tester 3 Connect the ends of the test leads to the equipment under...

Page 18: ...ce West USA is available Phone 800 748 6224 Hours 8 30 AM 4 30 PM Pacific Time Also available on our web site at www compwest com Contact Compliance West USA 650 Gateway Center Way Suite D San Diego C...

Page 19: ...e corrected at no charge Mail the instrument post paid to the manufacturer Dated proof of purchase is required for all in warranty repairs The manufacturer is also available for calibration and or rep...

Page 20: ...libration procedure must be performed by qualified personnel for more information contact Compliance West USA Voltage Stop Disable Keyboard Enable by Keyboard If the MegaPulse Defib 5PF 002 tester inc...

Page 21: ...21 Appendix 1 Commands table...

Page 22: ...22...

Page 23: ...23...

Page 24: ...24...

Reviews: