TECP-90-814 • Rev C • October 2020
Page 47
© 2020
CommScope
. All Rights Reserved.
Figure 61. Patch Cord Routing To Both Sides
7. Place patch cords within panel’s corner cable retainers and close the panel front cover.
Figure 62. Patch Cord Routing To One Side
9.2
Cable Spool Tray Positions and How to Use Them
The cable spool tray has three positions: operation (home); cable payout (inward); and full
connector access (outward). The panel ships in the operation position with the spool locking tab
protruding through the right side of the panel shell as shown in
.
26166-A
PATCHCORDS
CAN BE ROUTED
EITHER UP OR DOWN
CABLE
RETAINER
CABLE
RETAINER
26167-A
PATCHCORDS
CAN BE ROUTED
EITHER UP OR DOWN
CABLE
RETAINER
CABLE
RETAINER