11
INSTALLATION
1_DELIVERY
On delivery, the use and maintenance manual is attached to the machine, and considered an integral part
of the supply.
The machine is ready for use, in a single cardboard package on a pallet.
To lift the machine, you need a forklift or a trans pallet: insert the forks of the device used for lifting under
the pallet. If the machine is lifted with ropes or belts, pass them under the pallet.
Take care to manage the box while keeping the part up as indicated on the packaging.
On receiving the package and its content, check for damage during transport. Write any defects found on
the delivery document.
2_POSITIONING
The machine is supplied in a closed package and fixed with metal straps on wood.
After cutting the metal straps take out of the packaging and the plastic cover, then with the help of a proper
belt put under the machine (PICT. 3) and a fork lift (manual or motor) lift the machine and take away the
bottom pallet, position the machine making sure you leave a space around it of 50 cm to make usage,
cleaning and maintenance easier. If the machine is unstable put under the feet or wheels pieces of hard
rubber. If the machine has wheels make sure they have been blocked by pushing the lever A downwards
till it blocks (PICT. 4).
NOTE:
ALL PACKAGING MUST BE DISPOSED OFF IN A LAWFUL WAY.
Before positioning the machine, ensure the work surface is horizontal.
The plug must be easily accessible, must not require any kind of movement. The cable from the machine
to the wall plug must not be pulled tightly, also do not rest the machine on the cable.
Summary of Contents for 7485.0078
Page 8: ...8 4_7485 0078 7485 0080 7485 0085 7485 0090 7485 0095 WIRING DIAGRAMS...
Page 9: ...9 4_ 7485 0100 7485 0110 WIRING DIAGRAMS...
Page 22: ...22...
Page 25: ...25...