Electrical box installation
9.2
Tools and supplies required:
1 Screwdriver 0,6×3,5 mm
2 Adjustable wrench type Bacho 8071
3 Wrench 13 mm
4
Important information
The complete system is undergoing final testing before delivery and therefore has the
searchlight cables installed in box.
1. Ensure that the switch Q01in box is set to off.
2. Remove all the cables in the terminals, the terminals are push-in type and the wire is
released easily by pressing the orange button with a screwdriver while pulling lightly in
the wire.
3. Loosen the cable glands with an adjustable wrench and pull out the cables.
4. Mount the electric box on a firm foundation with the help of the wall brackets.
5. Install in reverse order and pay special attention so that the cables shields are mounted
correct in the cable glands, see figure 2 below for guidance.
Cables are connected according to the wiring diagram and double-checked before the
power is turned on using the main switch Q01 in the electric box.
CLITE2 Electrical Box (24Vdc)
EMC Gland Shield Connection
Summary of Contents for CLITE2
Page 57: ...INSTALLATION USER S MANUAL CLITE2 Page 57 OP Rotation illustration 270 0 90 180...
Page 66: ...Page 66 INSTALLATION USER S MANUAL CLITE2 Mechanical drawings 17 2 Operator Panel 17 2 1...
Page 67: ...INSTALLATION USER S MANUAL CLITE2 Page 67 Electrical box CLITE2 100 240VAC 17 2 2...
Page 68: ...Page 68 INSTALLATION USER S MANUAL CLITE2 Electrical box CLITE2 24VDC 17 2 3...
Page 74: ...Page 74 INSTALLATION USER S MANUAL CLITE2 CLITE2IR VIDEO CONNECTION 19...
Page 86: ...Page 86 INSTALLATION USER S MANUAL CLITE2...