Section 3
Installation Instructions
Issue: A Revision: 1 Date: 24/07/19 Ref: 100606
Page: 39
Power Supply Unit
3.11
Enough cable is supplied to mount the power supply up to a maximum of 10m
from the transmitter. A maximum total cable length of 25m may be used to link
the power supply to the receiver. These are the maximum permitted lengths of
cable and must not be exceeded.
Dimensions and mounting hole locations are identical to the signal processor and
are illustrated in Figure 10.
Summary of Contents for Energy Tech 401
Page 71: ...Section 5 Normal Operation Issue A Revision 1 Date 24 07 19 Ref 100606 Page 71 ...
Page 99: ...Section 5 Normal Operation Issue A Revision 1 Date 24 07 19 Ref 100606 Page 99 ...
Page 101: ...Section 5 Normal Operation Issue A Revision 1 Date 24 07 19 Ref 100606 Page 101 ...
Page 118: ...Page 118 EnergyTech 401 CODEL Operating and Maintenance Manual Monitoring Solutions ...