Page: 40
EnergyTech 401
CODEL
Operating and Maintenance Manual
Monitoring Solutions
Electrical Connections
3.12
Decide routing for all non-power cables (both those supplied by CODEL and
those sourced locally). Use common routing wherever possible and install
leaving sufficient free-end length to make final connections.
Power cables should be installed separately, using different routes if possible to
reduce the risk of cross interference. Leave sufficient free-end length to make
final connections.
CODEL supplied cables are provided with ferrite beads fitted to all cores to
protect against interference and should not be modified without consulting
CODEL.
3.12.1
Installation and
Connection of Cables
Wiring should only be undertaken by a qualified Technician.
DANGER!!!
Ensure that the power supply is isolated.
DANGER!!!
DO NOT switch the power on until all installation work is complete and the system is ready for commission
DANGER!!!
Comment [AC1]:
Summary of Contents for Energy Tech 401
Page 71: ...Section 5 Normal Operation Issue A Revision 1 Date 24 07 19 Ref 100606 Page 71 ...
Page 99: ...Section 5 Normal Operation Issue A Revision 1 Date 24 07 19 Ref 100606 Page 99 ...
Page 101: ...Section 5 Normal Operation Issue A Revision 1 Date 24 07 19 Ref 100606 Page 101 ...
Page 118: ...Page 118 EnergyTech 401 CODEL Operating and Maintenance Manual Monitoring Solutions ...