Section 3
Installation Instructions
Issue: A Revision: 1 Date: 24/07/19 Ref: 100606
Page: 29
power supply to signal processor – 7-core, overall screen, multi-stranded,
6/0.2mm. 0.5mm
2
current loop output - any suitable 2-core cable - maximum length depends upon
keeping output load within the 500
maximum load requirement
contact outputs - any 2-core cable capable of supplying the power to the
warning device/relay etc. 250V, 10A maximum
A.C. power - any suitable 3-core power cable capable of transmitting 50VA
serial data link (if required) - twin twisted pair cable with an overall screen - see
IEM Communications Manual for further details (Doc. ID 0006/6)
analogue inputs - any suitable 2-core cable - CODEL instruments have an
internal impedance of 240
for these inputs
Unpacking the Equipment
3.3
After the equipment has been unpacked, unless specifically requested by the
customer, the following equipment items should be found :
transmitter with 10m of cable and air purge
receiver with 10m of cable and air purge
signal processor
power supply
site mounting flange (2 off)
gaskets (4 off), selected screws and washers
3.2.5
Cable Requirements
Although screened cable is specified for the interconnecting cable, it is not necessary for the cable to be grounded.
NOTE
Summary of Contents for Energy Tech 401
Page 71: ...Section 5 Normal Operation Issue A Revision 1 Date 24 07 19 Ref 100606 Page 71 ...
Page 99: ...Section 5 Normal Operation Issue A Revision 1 Date 24 07 19 Ref 100606 Page 99 ...
Page 101: ...Section 5 Normal Operation Issue A Revision 1 Date 24 07 19 Ref 100606 Page 101 ...
Page 118: ...Page 118 EnergyTech 401 CODEL Operating and Maintenance Manual Monitoring Solutions ...